Emergency Response National Rates
| Item | Description | Unit | Rate |
| Personnel | |||
| Field Personnel | |||
| IC | Incident Commander | Hour | $300 |
| RM | Emergency Response Manager | Hour | $275 |
| SP | Senior Project Manager | Hour | $200 |
| PM | Project Manager | Hour | $165 |
| LO | Licensed Vessel Operator | Hour | $185 |
| TM | Tankerman / PIC | Hour | $160 |
| SU | Superintendent | Hour | $150 |
| AM | Assistant Project Manager (Operations, Planning, Logistics, Finance) | Hour | $155 |
| PS | Project Scientist/ Field Chemist | Hour | $160 |
| FS | Field Supervisor | Hour | $135 |
| BT | Bio-Hazard Field Technician | Hour | $125 |
| SM | Support Manager (Purchasing, Communications, Transportation, Decon) | Hour | $135 |
| VO | Vessel Operator | Hour | $130 |
| MC | Mechanic/ Welder | Hour | $125 |
| EO | Equipment Operator | Hour | $115 |
| SF | Site Foreman | Hour | $110 |
| MT | Marine Technician | Hour | $105 |
| DR | Driver (Commercial) | Hour | $120 |
| DH | Deckhand | Hour | $95 |
| TE | Technician, Emergency Response (Hazwoper) | Hour | $95 |
| RC | Resource Coordinator (Dispatch, Warehouse, Logistics) | Hour | $95 |
| Professional/Administration | |||
| COF | Call Out Fee | Each | $350 |
| CH | Certified Industrial Hygienist | Hour | $295 |
| TR | Trainer | Hour | $180 |
| HS | Health & Safety | Hour | $165 |
| IS | Information Systems Technician | Hour | $150 |
| SA | Senior Accountant | Hour | $155 |
| PR | Purchaser/ Subcontracts Administrator | Hour | $115 |
| BA | Billing Analyst | Hour | $105 |
| AS | Administrative Support/ Accountant | Hour | $80 |
| Profile Submission Fee | Each | $125 | |
| Profile Renewal Fee | Each | $40 | |
| Item | Description | Unit | Rate |
| Equipment | |||
| Temporary Storage | |||
| 3001 | Bladder/Pillow Tank, 24 barrel | Day | $424 |
| 3002 | Bladder Tank, 25 - 100 barrel | Day | $840 |
| 3003 | Bladder Tank, 101 - 240 barrel | Day | $1,672 |
| 3032 | Bladder Tank, Canflex, 300 barrel | Day | $1,199 |
| 3033 | Bladder Tank, Canflex, 600 barrel | Day | $1,793 |
| 3004 | Container, lntermodal or Connex Storage, 20' (plus delivery and P/U) | Day | $40 |
| 3005 | Container, lntermodal or Connex Storage, 40' (plus delivery and P/U) | Day | $78 |
| 3006 | Roll-off Bins, up to 20 cu yd (plus delivery and P/U) | Day | $36 |
| 3007 | Roll-off Bins, over 20 to 40 cu yd (plus delivery and P/U) | Day | $44 |
| 3008 | Storage Tank, 500-2500 gallon (plus delivery and P/U) | Day | $50 |
| 3013 | Roll-off Bins (Vacuum Box), up to 25 cu yd (plus delivery and P/U) | Day | $103 |
| 3031 | Storage Tank, up to 250 bbl/10,500 gal (plus delivery and P/U) | Day | $79 |
| 3023 | Storage Tank, (Frac Tank), 250 bbl/10,500 gal (plus delivery and P/U) | Day | $79 |
| 3015 | Storage Tank, (Frac Tank), 500 bbl/21,000 gal (plus delivery and P/U) | Day | $159 |
| 3014 | Tank Barge | Day | $19,500 |
| 3011 | Tank Barge or Barge Set, up to 238 bbl | Day | $2,500 |
| Excavation | |||
| 5001 | Backhoe 2wd, 65 hp, 14' depth | Day | $505 |
| 5003 | Backhoe Attachment, Breaker | Day | $360 |
| 5004 | Backhoe Attachment, Compactor | Day | $218 |
| 5013 | Bobcat, Skidsteer or equivalent 50-SShp, or 4 WD, backhoe. | Day | $678 |
| 5022 | Compaction, Sheepsfoot or Roller | Day | $807 |
| 5021 | Dump Truck, 5 cu yd, w/ Plow & Sander | Hour | $309 |
| 5007 | Excavator, Mini | Day | $791 |
| 5008 | Excavator, up to 37,000 lb. | Day | $1,499 |
| 5009 | Excavator, 38,000 to 53,000 lb. | Day | $1,845 |
| 5010 | Excavator, over 53,000 lb. | Day | $2,626 |
| 5017 | Excavator, over 100,000 lb. | Hour | $441 |
| 5011 | Excavator Attachment, Thumb or Wheel | Day | $638 |
| 5012 | Excavator Attachment, Hammer | Day | $972 |
| 5014 | Hydraulic Attachment, Breaker, Compactor or Grapple | Day | $309 |
| 5026 | Skidsteer Attachment | Day | $165 |
| 5015 | Loader, up to 3.5 cu yd | Day | $1,130 |
| Item | Description | Unit | Rate |
| Trailers | |||
| 6001 | Trailer, Confined Space Entry/Rescue | Day | $2,288 |
| 6002 | Trailer, Decon, up to 24' | Day | $885 |
| 6003 | Trailer, Dump, 7,000 - 12,000 lb. | Day | $438 |
| 6004 | Trailer, Dump, Side/End, 18 yd. | Hour | $67 |
| 6005 | Trailer, Emergency Response, up to 24' | Day | $835 |
| 6000 | Trailer, Emergency Response, 25'-39' | Day | $972 |
| 6006 | Trailer, Emergency Response, 40'- 48' | Day | $1,045 |
| 6007 | Trailer, Equipment, Utility, 1-2 ton | Day | $181 |
| 6008 | Trailer, Equipment, Utility, 3-10 ton | Day | $441 |
| 6009 | Trailer, Flatbed, up to 48' | Day | $335 |
| 6010 | Trailer, Incident Command Center, 24' | Day | $1,130 |
| 6011 | Trailer, Incident Command Center, 48' | Day | $2,434 |
| 6012 | Trailer, Low Boy | Day | $528 |
| 6013 | Trailer, MTR (boom, boat, skimmer add'I if deployed) | Day | $602 |
| 6014 | Trailer, Office | Day | $334 |
| 6044 | Trailer, Roll Off Bin, Double Rail Trailer | Hour | $120 |
| 6016 | Trailer, Side Dump, 3 axle | Day | $1,056 |
| 6017 | Trailer, Tilt Top, 26 ton | Day | $441 |
| 6018 | Trailer, Van, up to 48' | Day | $490 |
| 6045 | Trailer, Vessel Transport | Day | $1,837 |
| 6019 | Trailer, Water Buffalo (up to 500 Gallons, with pump) | Day | $351 |
| 6020 | Trailer, Wildlife Response and Rehab (supplies add'I) | Day | $4,392 |
| 6021 | Trailer, Wildlife Search & Collection | Day | $1,766 |
| 6022 | Trailer, Wildlife Support | Day | $630 |
| Trucks | |||
| 7001 | Tractor, Diesel | Hour | $109 |
| 7003 | Truck, Crane, 1 ton - 6 ton | Hour | $115 |
| 7007 | Truck, Dump, up to 10 yard | Hour | $109 |
| 7008 | Truck, Dump, over 10 yard | Hour | $120 |
| 7009 | Truck, Dump, over 10 yard with pup | Hour | $126 |
| 7016 | Truck, Flatbed or Van, 2-Axle, up to 24' | Hour | $84 |
| 7010 | Truck, Gear, less than 1 ton | Hour | $46 |
| 7012 | Truck, Gear, 1 ton | Hour | $74 |
| 7014 | Truck, Gear, 2 ton - 5 ton | Hour | $96 |
| 7017 | Truck, Hazmat Response, up to 26' | Hour | $134 |
| 7018 | Truck, Marine Response | Hour | $91 |
| 7019 | Truck, Roll Off Bin, Bobtail | Hour | $149 |
| 7021 | Truck, Water, up to 3000 Gallons | Hour | $170 |
| 7022 | Truck, Mobile Communications & Command Unit, 34' | Day | $1,714 |
| Item | Description | Unit | Rate |
| Vacuum Trucks/Trailers | |||
| 8001 | Guzzler/Air Mover (filters add'I) | Hour | $270 |
| 8018 | HydroExcavator (attachments additional) | Hour | $369 |
| 8017 | Hi-Rail Air Mover w/ Air-spade | Hour | $399 |
| 8008 | Sweeper - Vacuum & Brush | Hour | $219 |
| 8002 | Vactor/Jetter - Combo Unit (attachments add'I) | Hour | $301 |
| 8003 | Vacuum Trailer, 120 -130 bbl., Black Iron | Hour | $99 |
| 8004 | Vacuum Trailer, 120 -130 bbl., Stainless | Hour | $138 |
| 8006 | Vacuum Truck, 35 - 80 bbl. | Hour | $146 |
| Vacuum Truck, 35 - 80 bbl, stainless | Hour | $105 | |
| 8007 | Vacuum Trailer, less than 50 bbl. | Hour | $51 |
| Vehicles | |||
| 9003 | Auto, Personnel or Support | Day | $206 |
| 9008 | Crew, Response or Utility Vehicle, 4wd, or 2wd | Day | $380 |
| 9004 | Van, MTR (boom, boat, skimmer add'I if deployed) | Day | $714 |
| 9005 | Van, Maintenance, Personnel or Support | Day | $293 |
| 9006 | Wildlife Transport-Care Vehicle/Trailer | Day | $1,127 |
| Pressure Washers | |||
| 1214 | Dump-Style Gun, Foot Operated, up to 20k psi | Day | $152 |
| 1215 | Dump-Style Gun, Single, Safety Surround, up to 40k | Day | $225 |
| 1216 | Dump-Style Gun, Dual, Safety Surround, up to 20k psi | Day | $225 |
| 1217 | Dump-Style Gun, Multi Gun Valve Control System | Day | $187 |
| Surgace Cleaner 3500-5000 PSI | Day | $202 | |
| 1219 | Flange Mount Anti-Withdrawal Device | Day | $38 |
| 1206 | Flexible Lance, 50', Rigid Tip, Foot Pedal, up to Sk psi | Day | $126 |
| 1212 | Flexible Lance, 50', Rigid/Spinner Tip, Foot Pedal, Sk | Day | $214 |
| 1211 | Flexible Lance, 50', Foot Pedal, up to 20k psi | Day | $222 |
| 1221 | Flexible Lance, 50', Foot Pedal, up to 40k psi | Day | $244 |
| 1202 | Hydroblaster, 6,000 psi | Hour | $117 |
| 1203 | Hydroblaster, 10,000 psi | Hour | $120 |
| 1204 | Hydroblaster, 20,000 psi | Hour | $313 |
| 1222 | Hydroblaster, 40,000 psi | Hour | $362 |
| 1209 | Jetter Trailer | Hour | $162 |
| 1218 | Pipe Centralizer, 8" - 36" Diameter | Day | $60 |
| 1207 | Pressure Washer, up to 3,000 psi, single | Day | $438 |
| 1210 | Pressure Washer, trailered, up to 5,000 psi | Day | $809 |
| 1208 | Pressure Washer, 3,000 to 5,000 psi | Day | $611 |
| 1205 | Remote Tank Cleaning (Gamajet) Head | Day | $518 |
| 1201 | Specialty Nozzles up to Sk psi (Rota, fogging, etc.) | Day | $83 |
| 1213 | Specialty Nozzles over Sk psi (Rotating multi-tip) | Day | $145 |
| Item | Description | Unit | Rate |
| Blowers/Compressors | |||
| 1101 | Air Compressor, up to 100 CFM | Day | $249 |
| 1102 | Air Compressor, 100 to 185 CFM | Day | $416 |
| 1103 | Air Compressor, 210 to 375 CFM | Day | $652 |
| 1104 | Blower, Coppus, Electric/Pneumatic | Day | $181 |
| 1105 | Blower, Negative Air Exhaust, 6" (consumables add'I) | Day | $134 |
| 1106 | Blower, Negative Air Exhaust, 12" (consumables add'I) | Day | $194 |
| 1107 | Blower, Venturi, Horn | Day | $60 |
| 1108 | Exhaust Duct, 25' x 6", 10" or 12" | Day | $53 |
| Pumps | |||
| 1311 | Drum Vacuum (consumables add'I) | Each/Day | $256 |
| 1300 | Pump, Up to l", Chemical, Hand Operated | Each/Day | $244 |
| 1301 | Pump, up to 1", Petroleum | Each/Day | $104 |
| 1302 | Pump, up to l", Chemical | Each/Day | $165 |
| 1303 | Pump, 2", Petroleum | Each/Day | $151 |
| 1304 | Pump, 2", Chemical | Each/Day | $329 |
| 1305 | Pump, 2", Chemical Peristaltic | Each/Day | $592 |
| 1306 | Pump, 3", Petroleum | Each/Day | $181 |
| 1307 | Pump, 3", Chemical | Each/Day | $523 |
| 1312 | Pump, 3", Hydraulic (Archimedes/MT30) w/power pack | Each/Day | $2,632 |
| 1308 | Pump, 4", Petroleum | Each/Day | $301 |
| 1309 | Pump, 4", Petro-Submersible | Each/Day | $559 |
| 1324 | Pump, Fire, 1800 gpm lS0psi | Each/Day | $3,011 |
| 1325 | Pump, Sludge | Each/Day | $1,341 |
| 1310 | Pump, 5"- 6", Petroleum | Each/Day | $717 |
| 1316 | Pump, Double Diaphragm, Stainless Steel, 1" | Each/Day | $353 |
| 1317 | Pump, Double Diaphragm, Stainless Steel, 2" | Each/Day | $518 |
| Hoses/Pipes/Fittings | |||
| 1405 | Guzzler/ Air Mover Vacuum Breaker | Day | $60 |
| 1406 | Guzzler/Air Mover/Jetter Fittings (elbows, tees, etc.) | Each/Day | $19 |
| 1415 | Hose, Discharge (lay flat), 2" | 50 Ft/Day | $25 |
| 1416 | Hose, Discharge (lay flat), 3" | 50 Ft/Day | $36 |
| 1417 | Hose, Discharge (lay flat), 4" | 50 Ft/Day | $51 |
| 1418 | Hose, Discharge (lay flat), 6" | 50 Ft/Day | $41 |
| 1401 | Hose, Fire, 1.5" | 50 Ft/Day | $37 |
| 1402 | Hose, Fire, 2.5" | 50 Ft/Day | $45 |
| 1403 | Hose, Guzzler/Air Mover, Pipe, 4" | Ft/Day | $10 |
| 1404 | Hose, Guzzler/Air Mover, Pipe, 6" | Ft/Day | $12 |
| 1420 | Hose, Hydraulic | 50 Ft/Day | $37 |
| 1428 | Hose, Hydroblaster, up to 40,000 psi | 50 Ft/Day | $246 |
| 1407 | Hose, Pneumatic | 50 Ft/Day | $19 |
| 1429 | Hose, Pressure Washer, up to 6,000 psi | 50 Ft/Day | $37 |
| 1400 | Hose, Suction & Discharge, 1", Petro or Chemical | 25 Ft/Day | $45 |
| 1408 | Hose, Suction & Discharge, 2", Petro | 25 Ft/Day | $26 |
| 1409 | Hose, Suction & Discharge, 2", Chemical | 25 Ft/Day | $61 |
| 1410 | Hose, Suction & Discharge, 3", Petro | 25 Ft/Day | $43 |
| Item | Description | Unit | Rate |
| 1411 | Hose, Suction & Discharge, 3", Chemical | 25 Ft/Day | $77 |
| 1412 | Hose, Suction & Discharge, 4", Petro | 25 Ft/Day | $73 |
| 1413 | Hose, Suction & Discharge, 4", Chemical | 25 Ft/Day | $114 |
| 1414 | Hose, Suction & Discharge, 6", Petro | 25 Ft/Day | $94 |
| 1424 | Hose, Teflon, 1" Rubber Jacketed or 2" Stainless Braid | Ft/Day | $65 |
| 1419 | Hose, Wash, up to 1" | 50 Ft/Day | $19 |
| 1435 | Stinger, Hose Attachment | Day | $51 |
| Support | |||
| 1591 | 7 BBL Spill Kit (delivery add'I) | Day | $931 |
| 1501 | Air Knife | Day | $258 |
| 1555 | Bag Filter System, Single (Bag filters add'I) | Day | $102 |
| 1502 | Bag Filter System, Dual Pod (Bag filters add'I) | Day | $124 |
| 1567 | Banding Equipment, 2-inch | Hour | $60 |
| 1583 | Butane Flare Kit (includes hoses and nitrogen) | Day | $186 |
| 1503 | Carbon Filtration System | Day | Quote |
| 1504 | Chipping Gun, Pneumatic | Day | $91 |
| 1505 | Compactor, Hand Operated | Day | $261 |
| 1596 | Containment, Storage Tank | Day | $83 |
| 1506 | Decon Cleaning Pool, Portable 10' x 15' | Day | $222 |
| 1507 | Decon Cleaning Pool, Portable 10' x 30' | Day | $348 |
| 1508 | Decon Cleaning Pool, Portable 20' x 100' | Day | $972 |
| 1509 | Decon Cleaning Pool, Portable 25' x 50' | Day | $485 |
| 1510 | Decon Station, Personnel 2 Stage (supplies add'I) | Day | $87 |
| 1553 | Decon Station, Personnel 3 Stage (supplies add'I) | Day | $126 |
| 1580 | Drum Dolly | Day | $69 |
| 1511 | Electrical Accessories (cords, GFCI, adaptors) | Day | $26 |
| 1573 | Floor Buffer (pads add'I) | Day | $126 |
| 1593 | Fogger, handheld | Day | $113 |
| 1594 | Forklift, offroad | Day | $993 |
| 1512 | Forklift, SK to lOK lb. | Day | $490 |
| 1513 | Forklift, Attachment | Day | $181 |
| 1514 | Generator, less than 4 kW | Day | $120 |
| 1515 | Generator, 4 kW to less than 7.5 kW | Day | $199 |
| 1516 | Generator, 7.5 kW to 12.5 kW | Day | $293 |
| 1574 | Generator, over 12.5 kW to 67 kW | Day | $562 |
| 1569 | Hydrogen Peroxide System (consumables add'I) | Day | $1,490 |
| 1518 | Jackhammer | Day | $269 |
| 1519 | Ladder, Extension, Folding or Jacobs | Day | $74 |
| 1557 | Laser Level Kit, 1/16" x 100' | Day | $96 |
| 1558 | Laser Level Kit, ¼" x 100' | Day | $38 |
| 1520 | Light Tower, Trailer Mounted | Day | $376 |
| 1521 | Light, Explosion-Proof or Wet-Location | Day | $82 |
| 1570 | Light, Explosion-Proof, LED String, 10 lights/each | Day | $773 |
| 1522 | Light, Stand, Regular, SOOW | Day | $38 |
| 1523 | Light, Stand, Regular, 1000W | Day | $106 |
| 1590 | Nitrogen Sparger System, Remote Liquid Agitator | Day | $165 |
| Item | Description | Unit | Rate |
| 1525 | Pipe Plug 4" to 18" (includes 20' air line hose) | Day | $403 |
| 1526 | Pipe Plug 18" to 24" (includes 20' air line hose) | Day | $263 |
| 1527 | Pipe Plug 24" to 36" (includes 20' air line hose) | Day | $301 |
| 1528 | Pipe Plug 36" to 48" (includes 20' air line hose) | Day | $372 |
| 1529 | Pipe Plug 48" to 60" (includes 20' air line hose) | Day | $605 |
| 1500 | Pipe Plug 60" to 96" (includes 20' air line hose) | Day | $723 |
| 1572 | Portable Toilet (includes service, wash basin) | Day | $170 |
| 1563 | Portable Breathing Air Compressor | Day | $1,117 |
| 1530 | Power Pack, Hydraulic, 1 hp (<0.75 kW) | Day | $92 |
| 1531 | Power Pack, Hydraulic, 16 hp (0.75 kW< 12 kW) | Day | $249 |
| 1532 | Power Pack, Hydraulic, 40 hp (12 kW< 30 kW) | Day | $487 |
| 1533 | Power Pack, Hydraulic, 60 hp (30 kW< 45 kW) | Day | $878 |
| 1592 | Salvage Support Package (DC kit, compressor, stingers, etc.) | Day | $696 |
| 1534 | Road Closure Signs, reflective | Each/Day | $90 |
| 1536 | Sand & Floor Dry Spreader Attachment | Day | $170 |
| 1537 | Saw, Chain | Day | $109 |
| 1538 | Saw, Cutoff | Day | $225 |
| 1539 | Soil Sampler, Hollow Stem | Day | $90 |
| 1584 | Specialty Rope Bag (w/ shackles, D-rings, carabiners, pulleys) | Day | $416 |
| 1581 | Steel Plate, 4' x 8' | Day | $202 |
| 1582 | Steel Plate, 5' x 10' | Day | $261 |
| 1540 | Tools, Hand (brooms, shovels, etc.) | Each/Day | $22 |
| 1541 | Tools, Mechanical Set | Day | $106 |
| 1542 | Tools, Non-Sparking | Day | $79 |
| 1543 | Tools, Power, Small (drills, Sawzall, etc.) | Each/Day | $55 |
| 1544 | Truck Ramps | Day | $258 |
| 1545 | Vacuum, HEPA (filters add'I) | Day | $436 |
| 1546 | Vacuum, Shop (filters add'I) | Day | $92 |
| 1547 | Vactor/Jetter Attachment (hydro-exca, Drum-It head, nozzles) | Each/Day | $173 |
| 1566 | Vapor Extraction System, Portable | Day | $602 |
| 1588 | Welder, Extrusion, handheld | Day | $406 |
| 1548 | Welding Unit/ Torch Set, Portable | Day | $148 |
| 1549 | Wildlife Rehabilitation Pool | Day | $353 |
| 1550 | Wildlife Shelter, 19' x 35' | Day | $3,507 |
| 1551 | Wildlife Shelter, 20' x 20' | Day | $1,304 |
| 1552 | Yokohama Fenders, 8' diameter | Day | $304 |
| Item | Description | Unit | Rate |
| Communications | |||
| 1601 | Base Station | Day | $151 |
| 1603 | Computer and/or Printer | Day | $184 |
| 1604 | GPS Unit | Day | $90 |
| 1605 | High Power Repeater System w/Generator | Day | $518 |
| 1606 | Radio, UHF or VHF, Portable | Day | $51 |
| 1607 | Satellite Phone (includes 20 minutes airtime per day) | Day | $186 |
| 1608 | Satellite Dish for HS Internet | Day | $224 |
| 1609 | Respirator Comms System | Day | $202 |
| 1610 | IT ER Equipment Package - Office in a Box (SM) | Day | $3,259 |
| 1611 | IT ER Equipment Package- Mobile ER Unit (LG) | Day | $4,171 |
| 1612 | MIFI Hot Spot | Day | $63 |
| 1616 | Small Comms Package (6 15 radios, mikes, charging station) | Day | $372 |
| Safety | |||
| 1701 | Air Sampling Kit (tubes add'I) | Day | $74 |
| 1760 | Anti-Exposure Suit | Day | $77 |
| 1702 | Chest or Hip Waders, Insulated Cooling Vests | Each/Day | $53 |
| 1704 | Eyewash Station | Day | $67 |
| 1705 | Drager CMS Meter | Day | $348 |
| 1761 | Dry Suit/Cold Weather Gear | Day | $64 |
| 1763 | FR Cold Weather Gear | Day | $70 |
| 1764 | FR Rain Gear | Day | $50 |
| 1706 | Flotation Work Suit | Each/Day | $90 |
| 1707 | Flotation Work Vest, PFD | Each/Day | $20 |
| 1710 | Harness (including Lanyard or SRL) | Each/Day | $49 |
| 1730 | Hazcat Kit | Day | $256 |
| 1734 | Kendrick Extrication Device (KED) | Use | $343 |
| 1759 | Lighting, Portable (handheld, head lamp, cordless area lighting, etc.) | Each/Day | $31 |
| 1733 | Manometer | Day | $140 |
| 1711 | Meter, 4EC Radiation | Day | $630 |
| 1712 | Meter, LEL/O2/H2S/CO | Day | $261 |
| 1725 | Meter, LEL/O2/H2S/CO/PID | Day | $444 |
| 1713 | Meter, Jerome Mercury | Day | $1,034 |
| Absorbent Catch Basin/Bilge Boom | Each | $50 | |
| 1723 | Meter, Lumex Mercury | Day | $1,487 |
| 1714 | Meter, Personal, Gillian, Single or 4-gas | Each/Day | $74 |
| 1715 | Meter, Personal, Particulate Monitoring | Each/Day | $258 |
| 1716 | Meter, PID | Day | $351 |
| 1762 | Meter, Specialty (Benzene, etc.) | Day | $576 |
| 1717 | Mercury Vacuum (consumables add'I) | Day | $1,304 |
| 1724 | Remote Drum Drilling Unit | Day | $1,130 |
| 1757 | Rescue Gear, High Line System | Day | $1,130 |
| 1736 | Rescue Gear, SKED | Day | $46 |
| 1737 | Rescue Gear, Stokes Basket | Day | $31 |
| 1708 | Respirator, Full Face (cartridges add'I) | Each/Day | $66 |
| 1709 | Respirator, Half Face (cartridges add'I) | Each/Day | $45 |
| Item | Description | Unit | Rate |
| 1758 | Road Closure, Barricades, Cones, Delineators | Each/Day | $10 |
| 1719 | SCBA or Egress Bottles w/ Lines | Each/Day | $372 |
| 1729 | SCBA or Egress Bottles w/ Lines, Refill | Each/Day | $52 |
| 1731 | Shin and Metatarsal Guards, Aluminum | Day | $52 |
| 1720 | Six Pack/ Regulated Air Supply (includes up to 300' airline) | Day | $528 |
| 1738 | Support Station, Table and Chairs | Day | $208 |
| 1739 | Support Station, Canopy | Day | $52 |
| 1759 | Sweeper, power handheld | Day | $52 |
| 1740 | Swift Water PPE Equipment (River Vest, Helmet, Throw Bag) | Day | $230 |
| 1721 | Tripod and Winch | Day | $446 |
| 1732 | Turtle Armor Suit (Torso, Chaps, Gaiters, Gauntlets) | Day | $157 |
| Disperants/Aircraft | |||
| 1909 | Douglas DC-4/Convair 340 Spray Aircraft (includes first Air Crew) | Hour | $14,500 |
| 1910 | Douglas DC-6 Spray Aircraft (includes first Air Crew) | Hour | $15,750 |
| 1911 | Spotter Aircraft (includes first Air Crew) | Hour | Cost+20% |
| 1912 | Dispersant Loading Pumps | Day | $854 |
| 1913 | Dispersant, Applied ($10/gallon on Standby) | Gallon | Cost+20% |
| 1914 | Portable Dispersant Spray System | Day | $4,150 |
| Materials | |||
| Bags/Sheeting | |||
| MlOO | Bulk Bag, 1 yard | Each | $60 |
| M113 | Dunnage Bags | Each | $70 |
| MlOl | Plastic Bag, 36" x 60", 6 mil, SO/Roll or Box | Roll/Box | $218 |
| M102 | Plastic Bag, 36" x 60" (drum liner) | Each | $10 |
| M103 | Roll Off Bin Liner | Each | $83 |
| Ml04 | Sheeting, 20' to 32' x 100', 10 mil | Roll | $292 |
| MlOS | Sheeting, 20' to 32' x 100', 6 mil | Roll | $218 |
| MllO | Sheeting, 8' to 20' x 100', 4 mil | Roll | $127 |
| Mlll | Sheeting, 20' x 100', Flame Retardant, 6 mil | Roll | $149 |
| M112 | Sheeting, 12' x 100', Flame Retardant, 6 mil | Roll | $120 |
| Cleaners | |||
| M205 | Cleaner, Hand, 14 oz. Container | Each | $15 |
| M200 | Cleaner, Hand, 1 Gallon Container | Each | $56 |
| M201 | Cleaner, Marine/Industrial (Simple Green or equivalent) | Gallon | $51 |
| M202 | Bleach | Gallon | $17 |
| M204 | Decon Solvent (HD Citrus Degreaser, Penetone, PES-51) | Gallon | $148 |
| M211 | Disinfectant (IPA, Misty Biodet, Sporicidin, Zep DZ-7) | Gallon | $94 |
| M209 | Encapsulant Solution/ Defoamer | Gallon | $96 |
| M208 | Hydrogen Peroxide Fogging Aerosol | Gallon | $112 |
| M210 | Mastic Remover | Gallon | $44 |
| M207 | Mercury Cleaning Solution | Gallon | $135 |
| M206 | Mercury Vapor Suppressant | Pound | $65 |
| M212 | VOC Suppressant (BioSolve, Gold Crew) | Gallon | $186 |
| Item | Description | Unit | Rate |
| Containers | |||
| M318 | 1 Gallon, Poly Pail | Each | $23 |
| M301 | 5 Gallon, Bucket with Lid, Poly or Metal | Each | $40 |
| M313 | 5 Gallon, DOT Container with Lid | Each | $48 |
| M302 | 10-15 Gallon, Steel | Each | $146 |
| M319 | 15 Gallon, Poly | Each | $146 |
| M303 | 20 Gallon, Open Top, Steel | Each | $137 |
| M304 | 30 Gallon, Open or Close Top, Refurbished | Each | $147 |
| M320 | 30 Gallon, Open or Close Top, Steel, New | Each | $168 |
| M305 | 55 Gallon, Close Top, Steel, Refurbished | Each | $122 |
| M314 | 55 Gallon, Close Top, Steel, New | Each | $182 |
| M306 | 55 Gallon, Open Top, Steel, Refurbished | Each | $116 |
| M315 | 55 Gallon, Open Top, Steel, New | Each | $180 |
| M316 | 55 Gallon, Open or Close Top, Poly, Refurbished | Each | $127 |
| M307 | 55 Gallon, Open or Close Top, Poly, New | Each | $167 |
| M308 | 85 Gallon, Overpack, Unlined, Black | Each | $443 |
| M309 | 85 Gallon, Overpack, Lined, Yellow | Each | $473 |
| M310 | 95 Gallon, Overpack, Poly | Each | $512 |
| M317 | 275-300 Gallon, Liquid Tote, DOT, Recon | Each | $430 |
| M311 | 275-300 Gallon, Liquid Tote, DOT, New | Each | $826 |
| M321 | Fluorescent Tube Disposal Container, 4' | Each | $70 |
| M322 | Fluorescent Tube Disposal Container, 8' | Each | $129 |
| M312 | Triwall Box, Cubic Yard, DOT Approved | Each | $230 |
| Safety | |||
| Safety Fence Post | Day | $2 | |
| FRC Coveralls | Pair/Day | $65 | |
| Negative Air Filter - HEPA/ Carbon | Each | $70 | |
| M400 | Acid Suit, 1 Piece | Each | $165 |
| M401 | Boot, Steel Toe, Rubber | Pair | $65 |
| M493 | Boot, Steel Toe, HAZMAX Chemical (replacement) | Pair | $250 |
| M442 | Face Shield | Each | $29 |
| M402 | Glove, Work Glove | Pair | $15 |
| M403 | Glove, Inner, Cotton, Latex or Nitrile | Pair | $5 |
| M404 | Glove, Inner, Cotton, Latex or Nitrile, 50 per Box | Box | $115 |
| M405 | Glove, Silver Shield | Pair | $13 |
| M406 | Glove, Medium Duty, PVC | Pair | $12 |
| M407 | Glove, Heavy Duty, PVC | Pair | $19 |
| M408 | Glove, Heavy Duty, Butyl Rubber | Pair | $66 |
| M409 | Hard Hat | Each | $52 |
| M620 | Negative Air Exhaust Consumables Change Out | Each | $318 |
| M513 | Orange Construction Fence, 4'x100' | Roll | $120 |
| M410 | Overboot, Disposable | Pair | $21 |
| M607 | Petro Flag Test Kit | Per Test | $66 |
| M446 | PBI / FR Cotton/ Nomex Coveralls, replacement | Each | $658 |
| M426 | Protective Gear Level B | Each | $785 |
| M427 | Protective Gear Level B, Change | Each | $518 |
| Item | Description | Unit | Rate |
| M428 | Protective Gear Level C | Each | $165 |
| M429 | Protective Gear Level C, Change | Each | $112 |
| M430 | Protective Gear Level D | Each | $68 |
| M431 | Protective Gear Level D, Change | Each | $45 |
| M432 | Rain Gear, 2 Piece | Set | $45 |
| M445 | Rescue Rope, Lifeline or Tagline, 10' | Each | $26 |
| M433 | Respirator Cartridge, Single, OV, Acid Gas, PlO0 | Pair | $61 |
| M443 | Respirator Cartridges, Combo | Pair | $87 |
| M434 | Respirator Cartridge, Mercury/chlorine | Pair | $108 |
| M436 | Safety Eyewear | Each | $17 |
| M438 | Safety Vest | Each | $60 |
| M444 | Thermo Pro/Tychem TK Level B Suit | Each | $1,117 |
| M439 | Tyvek Suit, Saran-Coated, Disposable | Each | $60 |
| M440 | Tyvek Suit, Uncoated, Disposable | Each | $26 |
| M441 | Tyvek Suit, Poly-Coated, Disposable | Each | $45 |
| M489 | Tyvek Suit, Poly-Coated, Fire Resistant, Disposable | Each | $112 |
| Sorbents | |||
| MS00 | Absorbent, Chemical Stabilizer, 35 lb. | Bag | $237 |
| MS0l | Absorbent, Absorb X | Bag | $60 |
| M502 | Floor Dry, 25 lb. | Bag | $43 |
| M503 | Neutralizer, citric acid | Bag | $260 |
| M520 | Neutralizer, Ash or Bicarbonate | Bag | $69 |
| M519 | Neutralizer, Liquid | Gallon | $77 |
| M504 | Oil Snare on Rope, 50 ft/Bag | Bag | $247 |
| MS0S | Oil Snare, 30/Carton | Carton | $208 |
| M506 | Sorbent Boom 5" x 10', 4/Bale | Bale | $200 |
| M507 | Sorbent Boom 8" x 10', 4/Bale | Bale | $340 |
| M508 | Sorbent Roll, SXT 638, 38" x 144' x 3/8" | Roll | $343 |
| M509 | Sorbent Sheet 17" x 19" x 3/8", 100/Bale | Bale | $128 |
| MSlO | Sorbent Sweep 17" x 100' x 3/8" | Each | $236 |
| M514 | Straw Wattles, 25 ft/Roll | Roll | $96 |
| M512 | Universal Pads, ll"x13" orequivalent, SO/Bale | Bale | $167 |
| MSll | Vermiculite, 4 cu ft/Bag | Bag | $88 |
| Miscellaneous | |||
| M641 | Pallet | Each | $37 |
| M627 | Abatement Supplies (scrapers, mop-heads, etc.) | Each | $18 |
| M621 | Air Mover Dry Filter Sock | Each | $36 |
| M600 | Banner Tape, 3" | Roll | $36 |
| M638 | Brake Cleaner | Can | $18 |
| M619 | Catch Basin Filter | Each | $108 |
| M632 | Chemical Indicator Paper | Package | $48 |
| M626 | Chemtape | Roll | $76 |
| M601 | Cotton Rags, 25 lb. Box/Bale | Each | $104 |
| M602 | Decon Pool, Small Personnel | Each | $60 |
| M605 | 60-gallon pop up pool | Each | $270 |
| M617 | Flex Hose, Consumable, 4" | Foot | $7 |
| Item | Description | Unit | Rate |
| M618 | Flex Hose, Consumable, 6" | Foot | $10 |
| M628 | Floor Buffer Pads | Each | $95 |
| M604 | Duct Tape, 2" | Roll | $18 |
| M639 | Glue (3M Aerosol) | Can | $26 |
| M622 | HEPA Vacuum Consumables, Standard | Each | $94 |
| M625 | HEPA Vacuum Consumables, Tornado Filter | Each | $460 |
| M623 | HEPA Vacuum Consumables, Complete | Each | $837 |
| M631 | Lead Paint Field Screening Test Kit - 5 Tests | Each | $97 |
| M642 | Jute Netting (includes staples) | Roll | $212 |
| M653 | Mastic Tape | Roll | $212 |
| M606 | Mercury Vacuum Consumables Change Out | Each | $137 |
| M492 | Nitrogen Cylinder Refill | Each | $143 |
| M141 | Plug and Patch Kit | Each | $260 |
| M651 | Portland Cement | Bag | $29 |
| M613 | Rope, 600', up to 1/2" | Roll | $185 |
| M630 | Scrubbing Pads | Each | $9 |
| M603 | Sampling Tubes and Supplies | Each | $42 |
| M614 | Sand Bags, Filled | Each | $19 |
| M633 | Silt Fence, 100' | Roll | $209 |
| M616 | Sprayer, Handheld (Hudson), 3 Gallon | Each | $104 |
| M801 | Water, Drinking, 24/Case | Case | $45 |
| M850 | Mileage for Car (M850 + Eq Item#) | Mile | $2 |
| M851 | Mileage for Trucks/Vans (M851+ Eq Item#) | Mile | $3 |
| M852 | Mileage for Commercial Trucks | Mile | $3 |
| M860 | Equipment Fuel (Gasoline or Diesel) | Gallon | $12 |
| M883 | Fuel - Extra Heavy Equipment (up to 8 gallons per hr) | Hour | $83 |
| M884 | Fuel - Heavy Equipment (up to 5 gallons per hr) | Hour | $50 |
| M885 | Fuel - Light Equipment (up to 3 gallons per hr) | Hour | $25 |
| M880 | Bridge Toll, Vehicle, 2 axle | Each | Cost+ |
| M881 | Bridge Toll, Vehicle, 3 axle | Each | Cost+ |
| M886 | Bridge Toll, Vehicle, 4 axle | Each | Cost+ |
| M882 | Bridge Toll, Vehicle, 5 axle | Each | Cost+ |
| M901 | Transportation to TSDF, Triwalls, Totes, Drums | Each | Quote |
| Power Packs & Compressors | |||
| 1109 | Corken Compressor (291T / Corrosive Compatible) | Day | $900 |
| 1110 | Corken Compressor (491T / Corrosive Compatible) | Day | $1,450 |
| 1177 | Corken Compressor (490 LPG/NH3) | Day | $1,250 |
| 1564 | Hydraulic Power Pack, 75 hp with 100 ft. of Hydraulic | Day | $850 |
| 1576 | PTO Hydraulic Power Unit, with 100 ft. of Hydraulic | Day | $650 |
| Item | Description | Unit | Rate |
| Pumps | |||
| 1314 | Corken/Blackmer, Stainless Steel Sliding Vane (3") | Day | $850 |
| 1315 | Corken/Blackmer, Coro Vane or Equivalent (3") | Day | $850 |
| 1319 | Drum Pump, Stainless Steel (3") Positive Displacement | Day | $700 |
| 1320 | Double Diaphragm, Aluminum (2") | Day | $250 |
| 1321 | Double Diaphragm, Poly-Pro (2") | Day | $325 |
| 1322 | Double Diaphragm, Poly-Kynar/Teflon (1") | Day | $250 |
| 1318 | Fire/Dispersant | Day | $350 |
| 1313 | Jet Pump (gas eductor) 1" or 2" | Day | $325 |
| 1323 | Roper Vane Pump, Carbon Steel (3") | Day | $650 |
| 1426 | Stinger, 2", CPVC/SS/Carbon | Day | $200 |
| 1327 | 10 HP Magnetic Drive, non-contact pump, Teflon | Day | $950 |
| 1328 | 15 HP Magnetic Drive, non-contact pump, Teflon | Day | $1,000 |
| Hoses | |||
| 1423 | Chlorine Transfer, certified | Ft/Day | $85 |
| 1432 | Crosslinked Polyethylene Hose (2") | Ft/Day | $25 |
| 1433 | Crosslinked Polyethylene Hose (1") | Ft/Day | $8 |
| 1421 | LPG/NH3, 1" Vapor | Ft/Day | $17 |
| 1422 | LPG/NH3, 2" Liquid Transfer | Ft/Day | $37 |
| 1430 | Teflon, Rubber Jacketed {l") | Ft/Day | $50 |
| 1431 | Teflon, Stainless Steel Braid (2") | Ft/Day | $50 |
| 1427 | Transfer Fittings (gauges, nipples, risers, etc.,) | Transfer | $400 |
| 1436 | Stainless Steel Hose (3") | Ft/Day | $60 |
| 1425 | Stainless Steel Hose (2") | Ft/Day | $50 |
| 1434 | Ultra-High Molecular Weight Polyethylene Hose 2" | Ft/Day | $20 |
| Special Operations | |||
| Labor | |||
| SOXM | Project Manager XT (Reactive/Explosive/Cylinder/Compressed Gas) | Hour | $300 |
| SOFM | Project Manager - Fire | Hour | $275 |
| SOXT | Technician XT (Reactive/Explosive/Cylinder/Compressed Gas) | Hour | $250 |
| SOFF | Fire Fighter | Hour | $200 |
| SOWD | Welder (Hazardous Duty Welding) | Hour | $175 |
| SOTE | Special Ops Technician | Hour | $105 |
| Response Units | |||
| 6024 | Trailer, Reactive/Explosive/Special Operations | Day | $850 |
| 6025 | Trailer, Emergency Breathing Air | Day | $6,500 |
| 6027 | Trailer, Emergency Response Enclosed 20' | Day | $650 |
| 6028 | Trailer, Transfer compressed gas, static liquid 40-48' | Day | $1,350 |
| 6029 | Trailer, RV w/ Living Quarters (M & I not Included) | Day | $700 |
| 6030 | Trailer, Utility | Day | $300 |
| 6035 | Truck, 1-Ton Crew Cab | Day | $300 |
| 6032 | Truck, 11/2 Ton Crew Cab | Day | $425 |
| 6033 | Truck, 2 1/2 Ton Crew Cab | Day | $550 |
| 6046 | Truck, 10 ton Rescue, Quad Cab, 4x4, SRS Canada | Day | $850 |
| 6047 | Truck, Brush/Fast Attack w/300 Gallon Water Tank | Hour | $225 |
| Item | Description | Unit | Rate |
| 6031 | Truck, Emergency Response | Day | $450 |
| 6048 | Truck, Hi-Rail Brush/Fast Attack w/300 Gallon Water Tank | Hour | $275 |
| 6036 | Truck, Light/ Sedan | Day | $225 |
| 6034 | Truck, Mobile Command | Day | $975 |
| 6037 | Truck, Special Operations Semi- Over the road | Day | $977 |
| 6049 | UTV, 4 or 6 Wheel Unit | Day | $521 |
| 6050 | UTV, Wildland Unit, with fire suppression or rescue set up | Day | $762 |
| Fire Fighting | |||
| 1823 | Complete Turnout/Bunker Gear | Day | $400 |
| 1821 | Eductor {l", 1 ½") 60 to 95 gpm | Day | $100 |
| 1822 | Eductor (2 ½") 250 gpm | Day | $125 |
| 1806 | Fire Hose {l" to 3") Double Jacketed | Ft/Day | $3 |
| 1807 | Fire Hose (4" to 6") LDH | Ft/Day | $5 |
| 1808 | Fire Hose Tester | Day | $300 |
| 1825 | Fire Fighting Fittings Charge | Day | $750 |
| 1805 | Fire Fighting Quick-out Kits (flight ready)+ mob | Day | $1,500 |
| 1826 | Flash Suit | Day | $450 |
| 1824 | Frameless Bladder (10,000 gallon) | Day | $750 |
| 1813 | Job Box (Tools, Adapters, Fittings) | Day | $1,750 |
| 1803 | Mounted Monitor - (300-1250gpm) + consumables | Day | $1,500 |
| 1814 | Monitor & Nozzle, 2 ½" Inlet (500 GPM Ground set) | Day | $600 |
| 1815 | Monitor & Nozzle, 2 ½" Inlets (1250 GPM Ground Set) | Day | $875 |
| 1816 | Nozzle (1", 1 ½") | Day | $250 |
| 1817 | Nozzle (2 ½ ") | Day | $300 |
| 1818 | Nozzle, High-X (1 ½") | Day | $450 |
| 1819 | Nozzle, Piercing (1 ½") | Day | $325 |
| 1820 | Nozzle, Foam Pro | Day | $300 |
| 1809 | Pito Flow Meter | Day | $150 |
| 1804 | Portable Fire Pump (650gpm NFPA Rated)+ | Day | $2,950 |
| 1812 | Pressure Pump, Fire, 250 psi, 200 gpm | Day | $350 |
| 1810 | Suction Hose (4") | Section | $150 |
| 1811 | Suction Hose (6") | Section | $200 |
| 1800 | Trailer, Portable Fire w/ Pump | Day | $550 |
| 1801 | Trailer, Fire Fighting Foam, Type I, 550 gal+ | Day | $4,750 |
| 1802 | Trailer, Fire Fighting Foam, Type II, 275 gal+ | Day | $2,250 |
| Miscellaneous | |||
| 1703 | Chlorine A/B/C Response Kits (gaskets add'I) | Day | $750 |
| 1595 | Cylinder Recovery Vessel | Day | $2,500 |
| 1577 | Fabrication, Specialty Tool Charge | Day | $500 |
| 1559 | Flare, Ground Set, 2" | Day | $325 |
| 1560 | Flare, Ground Set, 3" | Day | $450 |
| 1561 | Flare, Stack, 2" | Day | $215 |
| 1562 | Flow Meter, 2", Stainless Steel | Day | $250 |
| 1597 | Hot Tap Kit, 2" (replacement bits and valves add'I) | Day | $2,500 |
| 1578 | Mag-Drill | Day | $300 |
| 1571 | Manway Adapter, 14"-22", Stainless Steel | Day | $500 |
| Item | Description | Unit | National |
| 1728 | Midland Capping Kit | Day | $1,750 |
| 1579 | SRV Puller/ Excess Flow Valve Defeater | Day | $775 |
| 1580 | Thermal lmager | Day | $950 |
| 1565 | Trident Magnetic Patch | Day | $1,500 |
| 1722 | Truck Rollover/Cylinder Drill Kit/Betts Valve | Day | $650 |
| Materials | |||
| M635 | AR-AFFF Foam | Gallon | $65 |
| M636 | High-X Foam | Gallon | $62 |
| M634 | Manway Gaskets | Each | $350 |
| M425 | Responder (encapsulated, Level A) | Each | $1,850 |
| M447 | Responder (encapsulated, Level A with flash cover) | Each | $4,300 |
| M853 | Mileage, Special Ops Trailer | Mile | $2 |
| M854 | Mileage, Special Ops Truck | Mile | $3 |
| M855 | Mileage, Special Ops Truck (11/2 ton, 2 1/2 ton) | Mile | $4 |
| M858 | Mileage, Special Ops Tractor or Rescue Truck (10 ton) | Mile | $4 |
| OSRO | |||
| Field Personnel | |||
| VO | Vessel Operator | Hour | $130 |
| LO | Licensed Vessel Operator | Hour | $185 |
| TM | Tankerman / PIC | Hour | $160 |
| MT | Marine Technician | Hour | $105 |
| DH | Deckhand | Hour | $95 |
| SC | Senior Consultant | Hour | $405 |
| co | Consultant | Hour | $315 |
| DP | Drone Pilot | Hour | $270 |
| DC | Data Collection Tech | Hour | $180 |
| DS | Drone Spotter | Hour | $135 |
| RRS Per Diem | Hour | $300 | |
| RRS Mileage | Hour | $1 | |
| Boom and Accessories | |||
| 1001 | Anchor Gear, Set (1 anchor, chain,< 90' rope, 1 buoy- add'I components $15/each) | Day | $58 |
| 1002 | Boom Mooring Light | Day | $26 |
| 1012 | Boom Vane | Day | $395 |
| 1003 | Contractor Boom, up to 21" | Ft/Day | $3 |
| 1004 | Petro Barrier, up to 24" | Ft/Day | $6 |
| 1005 | Ocean Boom, up to 42" | Ft/Day | $16 |
| 1006 | Silt curtain boom-permeable | Ft/Day | $6 |
| 1014 | Silt curtain boom-impermeable | Ft/Day | $6 |
| 1013 | Desmi Speed Sweep Boom System | Day | $3,013 |
| 1007 | Hydro-Boom System (boom, pumps, power pack, reel) | Day | Quote |
| 1008 | American Fire Boom (500'/ system minimum) | Day | Quote |
| 1009 | Oil Boom lnflator/Blowers | Day | $245 |
| 1010 | Hull Magnets | Each/Day | $47 |
| 1011 | Dual-Roller Boom Handler | Day | $518 |
| Item | Description | Unit | National |
| Vessels | |||
| 2025 | OSRV up to 126' (includes Master) | Day | $19,500 |
| 2026 | 46' Catamaran w/Disk Skimmer | Day | $8,000 |
| 2004 | Belt Skimmer Vessel, Marco 1-C | Hour | $768 |
| 4012 | OSRV up to 150'-180' (includes Master) | Day | $27,500 |
| 4002 | Response Vessel, 65' | Hour | $626 |
| 4028 | Response Vessel, 55' - 64' | Hour | $527 |
| 4029 | Response Vessel, 45' - 54' | Hour | $439 |
| 4030 | Response Vessel, 35' - 44' | Hour | $380 |
| 4004 | Response Vessel, 30' - 34' | Hour | $269 |
| 4005 | Response Vessel, 25' - 29' | Hour | $213 |
| 4006 | Response Vessel, 16' - 24' | Hour | $174 |
| 4007 | Skiffs w/outboard, 15' or less | Hour | $87 |
| 4026 | John Boat (15' and under) | Day | $253 |
| 4008 | Skiffs w/o outboard | Hour | $51 |
| Portable Recovery | |||
| 2002 | Belt Skimmer, Marco Class XI-C | Day | $6,500 |
| 2005 | Brush Skimmer, Lamar | Day | $6,055 |
| 2006 | Brush Skimmer, Aquaguard RBS-40 | Day | $4,197 |
| 2007 | Brush Skimmer, Aquaguard RBS-25, 35G or 10 Twin | Day | $3,372 |
| 2008 | Brush/Drum/Disc Skimmer, Aquaguard RBS-OS | Day | $1,428 |
| 2027 | Disc Skimmer, Crucial Magna ORD | Day | $1,399 |
| 2028 | Disc Skimmer, Crucial ORD-XP | Day | $1,307 |
| 2029 | Disc Skimmer, Hoyle T | Day | $1,916 |
| 2009 | Disc Skimmer, Ml-30, Komara 12K, USE Disc | Day | $3,013 |
| 2010 | Disc Skimmer, Vikoma Sea Skimmer | Day | $3,358 |
| 2124 | Disc Skimmer, X-150, Elastec | Day | $7,500 |
| 2030 | Disc Skimmer, Crucial, Coated Disc 13/30 | Day | $2,798 |
| Balaena Quick Strike Deployment System | Day | $4,500 | |
| 2031 | VOSS Package (disc skimmer, power pack, hose, knuckle crane, boom vane) | Day | $6,385 |
| 2011 | Drum Skimmer, Rota 70 | Day | $5,882 |
| 2032 | Drum Skimmer, Elastec 118G | Day | $3,372 |
| 2012 | Drum Skimmer, Action Petroleum Model 60, 48 | Day | $2,367 |
| 2013 | Drum Skimmer, Action Petroleum Model 36 | Day | $2,009 |
| 2014 | Drum Skimmer, Action Petroleum Model 18, 24 | Day | $1,342 |
| 2033 | Drum Skimmer, Action Petroleum Model 12 | Day | $962 |
| 2034 | Drum Skimmer, Crucial Double DB-18H-36 | Day | $1,321 |
| 2045 | Drum Skimmer, Coated, Crucial 1CD-18H-36 | Day | $1,915 |
| 2037 | Rope Mop Skimmer, 4 Band | Day | $1,995 |
| 2015 | Rope Mop Skimmer, 11-9 | Day | $1,342 |
| 2016 | Rope Mop Skimmer, 1-4, 11-4, 11-6 | Day | $1,012 |
| 2017 | Rope Mop Skimmer Rope, 100' | Day | $187 |
| 2038 | Vacuum System, Elastec Mini-Vac | Day | $1,478 |
| 2039 | Vacuum System, Elastec PACS 1000 | Day | $1,650 |
| 2040 | Vacuum System, Transvac SOOD | Day | $1,600 |
| 2018 | Vacuum System, Vacuum Transfer Unit (VTU) | Day | $1,700 |
| Item | Description | Unit | National |
| 2019 | Weir Skimmer, Desmi 250 or Terminator | Day | $5,882 |
| 2041 | Weir Skimmer, Elastec Sea Skater | Day | $2,654 |
| 2044 | Weir Skimmer, Elastec Ocean Skater | Day | $3,910 |
| 2020 | Weir Skimmer, Foilex, vacuum | Day | $2,511 |
| 2021 | Weir Skimmer, Foilex, hydraulic | Day | $4,197 |
| 2022 | Weir Skimmer, Cascade LP 3000 or Vikoma Fastflow | Day | $2,650 |
| 2023 | Weir Skimmer, Skimpak or Oleo, 2" or 3" | Day | $560 |
| 2042 | Weir Skimmer, Floating (Desmi Mini-Max, Duckbill, Manta) | Day | $514 |
| 2043 | Weathered Oil, USE SWORD (dewatering Bags $85/ea add'I) | Day | $2,963 |
| 3015 | Storage Tank, (Frac Tank), 500 bbl/21,000 gal (plus delivery and P/U) | Day | $159 |
| 3014 | Tank Barge | Day | $19,500 |
| 3011 | Tank Barge or Barge Set, up to 238 bbl | Day | $2,500 |
| Rapid Response UAV/Vehicles | |||
| DJI M600 Pro | Day | $1,800 | |
| DJI P4 RTK / DJI M3E | Day | $1,350 | |
| Parrot Anafi | Day | $1,350 | |
| Incident Command Trailer | Day | $4,500 | |
| Starlink | Day | $375 | |
| Siyata Radio | Day | $99 | |
| PTT Access | Day | $45 | |
| Sunlight Readable Tablet | Day | $180 | |
| Polaris | Day | $1,800 | |
| Crew Truck | Day | $540 | |
| Generator | Day | $270 | |
| GeoSlam (LiDAR) | Day | $1,800 | |
| AeroPoints | Day | $450 | |
| Zenmuse XT2 (Thermal) | Day | $900 | |
| Zenmuse Z30 (HD/Zoom) | Day | $450 | |
| P4 / M3T (Multispectral) | Day | $1,350 | |
| Matterport | Day | $1,440 | |
| Activate Dashboard | Event | $1,200 | |
| Activate Rapidlink | Event | $1,200 | |
| Process Geoslam Data | Event | $315 | |
| Process Drone Sensor Data | Flight | $279 | |
| Topo Map | Event | $180 | |
| Site Map | Event | $270 | |
| lsocountour Map | Event | $450 | |
Rate Terms
General
The Rate Schedule and Terms and Conditions shall together be referred to herein as the “Rate Schedule”. All services provided under this Rate Schedule are subject to Contractor’s Environmental Services Terms and Conditions (“Service Terms”) incorporated herein by this reference and located at: www.RepublicServices.com/ServiceTermsES. A hard copy of the Service Terms will be provided upon request. By requesting services covered by this Rate Schedule, Customer acknowledges that it has read and agrees to be bound by the Service Terms and this Rate Schedule. If Customer has a valid contract with the performing Contractor that includes the scope of services provided pursuant to this Rate Schedule, the terms of such contract shall prevail in the event of any conflicts with the Service Terms or this Rate Schedule. No terms or conditions on any Customer-provided document or related to Customer’s vendor set up process shall apply. This Rate Schedule and the Service Terms or contract, as applicable, contain the entire agreement of the parties related to the services provided hereunder.
Financial
Customer’s request for services covered by this Rate Schedule shall constitute Customer’s agreement to pay for such services pursuant to this Rate Schedule on a time and material basis, regardless of any estimates provided by Contractor. This Rate Schedule is updated and published annually. Charges will be based on the most current published Rate Schedule. All rates are in U.S. dollars. Republic Services’ EEC fee will be charged on your services. The EEC fluctuates monthly and will be charged as a percentage of all invoiced charges, excluding taxes state, and local fees. For more information about this fee, please visit www.republicservices.com/customer-support/fee-disclosures. Unless otherwise set forth in a contract with the performing Contractor, all emergency response services are subject to a call out fee of $480 and a minimum charge of $6,850.00. If the response requires resourcing, coordination, and support for dispatching, Personnel time will be charged accordingly. The call out fee, minimum charge, and any charges estimated to exceed the minimum must be paid in advance of any response. Payments made using credit cards (VISA, MASTERCARD, AMEX) shall incur an additional processing fee of 3%. Contractor will utilize company owned resources when possible and invoice Customer at rates published herein. In the event Contractor cannot complete the work with company owned resources and is required to utilize a third-party vendor, supplier, or subcontractor, Customer will pay, at Contractor’s discretion, the rates published herein or Contractor’s cost plus 20%. This includes, but is not limited to, all third-party rental equipment, subcontract services, container/tanker washout, materials, airfare, supplies, analytical services, and other outsourced items/services. For any other materials, equipment, or services not specifically listed in the Rate Sheet, Customer will pay Contractor’s cost plus 20%.
Personnel
1. Personnel will be billed portal to portal in half-hour increments. A 4-hour minimum applies to all projects except for those over 50 miles from the Contractor personnel’s assigned office location, which will be charged an 8-hour minimum.
2. Labor rates will be charged for all hours, including mobilization and demobilization in accordance with daily tickets generated by supervisory personnel on site. Straight Time (ST) rates will be charged for hours from 0700 to 1500, Monday through Friday. Overtime (OT) will be charged at 1.5 times ST for hours between 1500 and 0700 Monday through Friday and weekends from 1500 Friday to 0700 Monday. Double Time (DT) will be charged at 2 times ST rates for all national holidays as well as Contractor and applicable union-recognized holidays including, but not limited to, New Year’s Day, the birthday of Martin Luther King, Jr., Washington’s birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, the day after Thanksgiving, Christmas Eve and Christmas day. When a holiday falls on a weekend, the nearest weekday will be billed at the DT rate. DT will also be billed for hours worked over 12 in those locations with mandatory state and/or union double time pay requirements. Changes to standard start times may be approved on a case-by-case basis for longer term projects. All time for international projects will be charged at 1.5 times the rates outlined herein. All time for providing expert testimony in any court, deposition, hearing, or other legal appearance, including preparation and travel time, will be charged at DT.
3. All project specific personnel, including accounting, administrative, personnel support, logistics and management, whether on site, at Contractor offices, or at support locations, are chargeable. All personnel are charged according to the above rates, regardless of full-time, part-time, or third-party labor source status, unless provided as part of a specified subcontracted service. Surcharges apply for remote sites and prevailing-wage projects. Personnel will be charged per their standard category rates for participation in any activity provided on behalf of the Customer including depositions, interviews, document preparation, or other legal activities.
4. Time charges begin with equipment and personnel mobilization activities and terminate at the conclusion of the services, including transportation of equipment and personnel back to operations centers and any necessary demobilization activities including but not limited to service, repair, and restock of vehicles and equipment utilized in the performance of services. Personnel time is charged in half-hour increments for all personnel. All hourly rates will be charged portal-to-portal from the location of personnel when dispatched (i.e., personnel office, home, hotel, other jobsite, etc.). Personnel on standby for Customer will be charged at 8 hours per 24-hour period.
5. Transportation and any incidental costs for all emergency response personnel, both on site, at support locations and traveling to and from the site or support locations, are charged at cost plus 20%. Per Diem charges for food in metropolitan areas are $103.00 per person per day. Non-premium area per diem rates for lodging are $205.00 per person per day, unless actual costs incurred are greater, in which case charges will be billed at cost plus 20%. In lieu of per diem, marine personnel assigned to vessels will be billed a daily "rack & meal” charge of $34.00 per rack and $34.00 per meal per day. The above “rack & meal” charge will also apply to non-Contractor personnel assigned to a vessel. Rates for premium areas and remote sites will be determined by Contractor at the time of service.
6. Customer will be charged $1,644 for up to 8 hours, including travel time, for tabletop exercises, drills or training support per person. Additional hours over 8 hours per person will be charged at $240 per hour. Charges are applicable to both onsite and virtual support. Travel and other expenses will be charged at cost plus 20%. Customer will be charged $685 for up to 4 hours of Contractor personnel time for limited virtual drill support activities, such as confirming Contractor equipment availability and providing sample ICS documentation.
Equipment
1. Contractor does not rent equipment in a bare condition. All equipment shall be operated and controlled by Contractor or Contractor-approved subcontractor personnel. Contractor maintains exclusive rights to assign specific equipment operators and/or vessel crews for response operations. All equipment sent to site by Contractor shall be in a basic operating condition. Additional components charged to Customer include, but are not limited to, multiple hose lengths, blast shields, specialty tips or fittings, specialty connections, noise abatement, catalytic converters, etc. Equipment prices do not include fuel, operator, or mobilization unless otherwise stated. Fuel consumed in non-mileage related operation of equipment, including vehicle and non-vehicle equipment and vessels, will be charged per Material rates. Equipment that requires electrical connection to owner/facility provided power shall only be connected by licensed electricians experienced in the type of connection required and voltage rating. Equipment that requires air power to operate may be attached to owner/facility provided that the pressure and connections are compatible with Contractor equipment and that shut off valves are in compliance with regulations.
2. Unless otherwise specified, time charges are calculated portal to portal beginning with equipment mobilization activities from the Contractor office or operations center, all time at the site, including any demurrage, and time charges terminate at the conclusion of the operation, which includes transportation of equipment back to Contractor office or operations center and completion of any necessary demobilization activities, including disposal, cleaning, repair, replacement and/or delivery to Contractor of restored equipment.
3. Day rates are based on 8 hours of operation. Minimum charge for day rate equipment is daily charge per day with additional hours over 8 charged in half-day increments for up to a total of 3 days’ charge during a 24-hour period. Minimum call out for hourly equipment is 4 hours per day except that all aircraft require a 5-hour minimum per day. Customer will be charged for unused requested equipment until released and returned to service per paragraph 2 above.
4. In addition to payment of rental charges, Customer agrees to pay Contractor for any cleaning or repairs necessary to return all equipment to the same condition as at the commencement of services (with the exception of normal wear and tear). Customer is also responsible for the payment of all transportation and disposal charges for any waste generated during cleaning. Only Contractor or its subcontractors shall perform any cleaning and decontamination operations on all equipment owned, rented, or subcontracted by Contractor. If Contractor determines that equipment cannot be returned to the condition it was in at the commencement of the services, Customer shall pay for all costs at cost plus 20%, including freight and other expenses incurred by Contractor to replace such equipment. If Contractor determines that any boom, whether new or used, is damaged beyond repair, Customer shall pay to replace the boom with new boom at cost plus 20%, including freight and other expenses. Customer shall pay for all costs of verification sampling, including wipe testing, fluid analysis, filter change outs, etc., per regulations of any equipment that requires such prior to returning to unlimited operations, whether at Contractor facilities or rental yards.
5. Mobile Communications & Command Unit rate includes the following: UHF-FM, VHF-FM, VHF Marine, fax machine, copier, and satellite system capability (with VOIP/Internet). Service use/satellite airtime charges will be billed separately at cost plus 20%.
6. Any and all surcharges, including but not limited to general, marine, equipment, and Jones Act insurances charged by Contractor subcontractors that are directly connected with resources provided to Customer will be billed to Customer at cost plus 20%.
7. Base OSRV crew consists of licensed Master and Mate (included in OSRV rate) and 2 Deckhands. Additional responders and support personnel (e.g. cook, tankermen) may be deemed necessary based on magnitude of event, weather conditions and event duration.
8. All vessels and waterborne equipment rates will be increased by fifty percent (50%) when operating in ice conditions.
9. Contractor resources deployed to areas outside of the Customer's contractual Area of Service will be subject to a thirty percent (30%) surcharge.
Materials
1. All materials and supplies utilized, whether listed in daily reports or not, are chargeable in full Units as listed in the Rate Schedule (i.e., gallon, roll, each, pair, etc.), regardless of how much is used. Any materials or supplies not listed on the Rate Schedule, including Wildlife Trailer supplies and expendables and third-party invoices for services, including subcontractors, will be billed at cost plus 20%. Disposal at Contractor owned facilities will be charged at the current published rates for each facility.
2. The number of change-outs of Personal Protective Equipment (PPE) are based on conditions occurring in the work area. PPE shall be changed at a frequency that conforms to safety practices to prevent exposure to employees during the work activity. PPE levels include:
Level D: coveralls/uniform, steel toe boots, safety glasses, work gloves, hard hat and safety vest as applicable
Level C: Level D plus disposable Tyvek, full face or half face respirator (excluding cartridges)
Level B: Level C plus SCBA or supplied air (includes mask, supplied air, 100’ hose, bottle manifold and egress bottle)
3. Brand names are provided for reference only and Contractor reserves the right to substitute as needed with products of equal quality, construction, and performance.
4. Contractor’s use of facility-directed or Customer-directed decontamination products, including but not limited to degreasing agents, cleaners, strippers, conditioners, cutter stock, etc., shall be done at the facility’s or Customer’s risk.
5. Fuel usage (non-driving) charged for hours operated by type as follows: Extra Heavy Equipment (Guzzler, Jetter, Large Yellow Iron >89 HP, and similar) = 6 gals/hr; Heavy Equipment (Tractors, Vacuum Trucks, >50 HP Compressors, Water Blasters, Large Generators, Small Yellow Iron <89 HP, PTO-driven, and similar) = 3 gals/hr; Light Equipment (Pressure Washers, Compressors <50 HP, Light Towers, Small Generators, and similar) = 1 gal/hr.
6. In consideration of ongoing national supply chain issues and rising inflation, Contractor reserves the right to amend the Materials and Supplies rates herein at any time, including Mileage and Equipment Fuel rates, either by revising rates to reflect current market conditions or by charging for items on a cost plus 20% basis.